The risk is the probability or chance that the hazard will lead to injury. A hazard is sometimes unavoidable i.e. a vee belt drive, a chain drive, a furnace.... all present hazards. The risk of harm from these hazards is however controllable. It is a HSE requirement and a requirement of all European directives that workers in industry and the public are protected from harm and it is a designers responsibility to ensure that machines are designed to be safe. An important part of the design process is to complete a risk assessment. The Machinery Directive "98/37/EC" (ref link below) identifies requirements in this direction. The hazard analysis / risk assessment is outlined in the standard BS EN 1050:1997 "Safety of machinery. Principles for risk assessment" . The purpose of this standard is to provide guidance for the safety of machinery and the type of documentation required in verifying a risk assessment. This standard also describes procedures for identifying hazards, estimating and evaluating risk. The following methods of completing risk assessments are defined..
Three standards providing guidance on machine safety provisions including guards and controls are listed below
Risk assessment is a series of logical steps in conducting the examination of the hazards associated with machinery. Risk assessment is followed, whenever necessary, by risk reduction. Risk analysis provides information required for the risk evaluation, which allows an evaluation to be made on the safety of machinery.
The notes below are outline only ..More detailed information is provided in the links below.. A fault trees is a graphic model of the pathways within a system that can lead to a foreseeable, undesirable fault event. The pathways interconnect contributory events and conditions, using standard logic symbols. Numerical probabilities of occurrence can be entered in the model to evaluate probability of the foreseeable,undesirable event. Symbols.. Symbols are used in fault tree analysis to represent events and the logical interface between the events. Most fault tree analyses can be carried out with just four symbols..
In the above fta logic diagram the intermediate event "B" results if basic events E or F or G occur. The intermediate event D results if basic events H and J and K occur simultaneously. The top fault event results if events B or C or D occur.
For system based on an "OR" gate with two initiating fault events A & B the probability of a system failure Pf = PA +P B - P A . P B For system based on an "AND" gate with two initiating fault events A & B the probability of a system failure Pf = P A.PB Example; An "OR" gate with two initiating events A with a probability of failure of 10-3 per year and B with a probability of failure o 10-2 per year will result in a system failure probability of 11 * 10-3 per year An "AND" gate with similar events will result in a system failure probability of 10-5 per year Example fault tree with failure data included...
Additional Symbols